CMU walls
Eight-inch and specified masonry walls laid to plan dimensions, openings and required elevations.
Concrete PlusEast CoastRequest an estimate CMU block & masonry
CPEC builds reinforced CMU wall systems for residential, commercial and new-construction work, coordinating block, reinforcing steel, grouted cells and beam details from the plans.

Scope of work
Eight-inch and specified masonry walls laid to plan dimensions, openings and required elevations.
Vertical reinforcing steel and grouted cells coordinated with the structural wall schedule.
Masonry beam work, reinforcing and grout placement based on the approved details.
Footings, dowels, slab edges and masonry interfaces coordinated within the contracted scope.
Planning the work
Wall locations, openings, dowels, reinforcing laps, embeds, beam elevations and inspection stages must agree with the current drawings. Our proposal identifies material, labor and coordination assumptions.
Common questions
We can quote labor-and-material or selected labor scopes depending on the plans, schedule and project requirements.
Yes, when reinforcing steel and grouted cells are included in the defined masonry scope.
Yes. Send the architectural and structural sheets, wall schedule, details, project address and requested scope.
We review engineered reinforced masonry wall scopes. Design, drainage and site conditions must be addressed in the approved documents.
Palm Beach County · Main Service Area